Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Sustainable built environment imperative for the future of the industry

06 Apr, 2023
vegetation



The peak national body representing the building and construction industry has taken another step in its commitment to a sustainable built environment by joining the Australian Sustainable Built Environment Council (ASBEC).

Master Builders Australia CEO Denita Wawn said the industry was committed to meeting its net zero obligations and was formalising partnerships with key stakeholders to better utilise the network of expertise on critical policy reform areas.

Wawn said: “The transition to a net zero built environment is one of the most significant policy reform areas impacting building and construction and the future direction of the sector.

“Building a sustainable future requires a collective effort from all stakeholders, and the building and construction industry has a crucial role to play in achieving this goal.

“Master Builders has committed to supporting this agenda with three essential factors that need to be in place to support this transition.

“[These are] mitigation of risks in the transition journey; suitable information and education resources developed to support industry transformation; and adequate transition timeframes to enable the sector to effectively transition.

ASBEC Executive Director Alison Scotland welcomed Master Builders Australia to the collaborative industry network, and said it would add immense value to ASBEC’s work.

Scotland said: “This partnership will enable Master Builders to contribute to and participate in the collective efforts of built environment stakeholders in shaping policy and boosting sector capability that helps deliver more sustainable, decarbonised communities, effective regulation, codes and standards, and that improves Australia’s new and existing building stock.”

Key priorities that Master Builders would like to see more work on include:

  • Skilling the sector for energy transformation;
  • Retrofitting and improving existing building stock;
  • A plan for decarbonisation of building products and product assurance;
  • Developing resources that raise awareness about risks from regulatory change, such as moisture management and how to deal with it; and
  • Addressing conflicts in the National Construction Code (NCC) between existing and new building requirements.

Wawn added: “By addressing these priorities, we can create a more sustainable built environment that benefits both the industry and the wider community.”

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Australian Building Sustainability Association (ABSA)

Vista Concepts

Vista Concepts

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
09 Oct

Atmos Renewables awards contract for Queensland battery project

09 Oct

Australia becomes first country to pledge to double global rooftop solar by 2030

07 Oct

Origin Energy lodges plans to expand Eraring BESS

07 Oct

Australia’s battery subsidies drives focus to usage sizing over rebate chasing

07 Oct

Neoen commences construction of 346 MW Goyder North Wind Farm

09 Oct

Western Australia allocates $5.1M in funding for greening projects across Perth and Peel

09 Oct

AGL partners with Bega Group for large-scale rooftop solar project

07 Oct

Solar integration sets a new benchmark at Western Sydney International Airport

06 Oct

KGBS opens green building finance repository platform

18 Sep

ARENA funds electrification trial for 1,000 Canberra homes

06 Oct

Tasmania launches new waste and resources recovery education program

05 Oct

Tasmania launches grants program to push for local circular economy solutions

01 Oct

Australia risks losing battery plants overseas

29 Sep

Rio Tinto, Shougang Group launch industrial-scale carbon capture trial facility

28 Sep

Coal exits put Australia’s grid reliability to the test

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required