Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Gamuda Land breaks ground on $90m eco-friendly residential project in St Kilda

19 Aug, 2024
Gamuda Land breaks ground on $90m eco-friendly residential project in St Kilda



Gamuda Land (Australia) has commenced construction on a groundbreaking $90 million sustainable living project in St Kilda, Melbourne.

The development, named Fareham, is set to become one of the greenest multi-residential buildings in the city, establishing a new benchmark for eco-conscious living.

Fareham, designed by award-winning architect BayleyWard, aims to achieve net-zero operations and a minimum 8-Star average NatHERS rating.

This is particularly significant given that only 3.77 per cent of dwellings in Victoria are rated 8-Star or higher, according to CSIRO data.

The project will be powered by an embedded network providing 100 per cent renewable energy, including rooftop solar photovoltaic panels.

The 73 residences will feature water-efficient WELS-rated fixtures and fittings, from dishwashers to taps.

To encourage environmentally friendly travel, the building will include EV charging capabilities, secure bike parks, and an onsite bicycle workshop.

Gamuda Land has partnered with Markscon, a family-owned construction firm known for its work on industry-leading Nightingale projects, to implement sustainable construction techniques.

These include:

  • Incorporating passive design principles
  • Utilising green concrete technology where possible
  • Prefabricating concrete elements offsite to reduce new material usage
  • Aiming to divert 90 per cent of all waste from landfills through careful sorting and recycling

Future residents of Fareham will enjoy:

  • Consistent internal temperatures and lower energy bills due to air-tight construction, high-performance thermally-broken windows, and high levels of insulation
  • Exceptional bay views from the 16-level building
  • Access to a communal garden on level one, a wellbeing room on level two, and a communal rooftop on level 15

Jarrod Tai, Gamuda Land General Manager, emphasised the company’s commitment to sustainable development: “In 2021, Gamuda Land unveiled the Gamuda Green Plan — a commitment to sustainable construction and development, with specific steps to reduce corporate greenhouse gases emission intensity by 30 per cent in 2025, and by 45 per cent in 2030.”

Fareham is currently under construction and is scheduled for completion in 2026. Limited residences remain available, with prices ranging from $600,000 to $4,000,000.

This project represents a significant step forward in sustainable urban development, setting a new standard for eco-friendly living in Melbourne’s multi-residential space.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Melbourne Build Expo 2026

Progress 2030 Summit

Progress 2030 Summit

Melbourne Build Expo 2025

Connecting Hydrogen APAC 2025

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
07 Oct

Origin lodges plans to expand Eraring BESS

07 Oct

Australia’s battery subsidies drives focus to usage sizing over rebate chasing

07 Oct

Neoen commences construction of 346 MW Goyder North Wind Farm

06 Oct

Australia moves to deliver Marinus Link to connect Tasmania and Victoria

05 Oct

Atmos Renewables reaches financial close on 1 GW of renewable energy projects

18 Sep

ARENA funds electrification trial for 1,000 Canberra homes

18 Sep

Bamboo breakthrough could reshape Australian construction materials

09 Sep

Young creator builds wheelbarrow from waste timber

04 Sep

Amazon cities partner to develop prioritised climate solutions

28 Aug

New data centre standards aim to cut energy use

06 Oct

Tasmania launches new waste and resources recovery education program

05 Oct

Tasmania launches grants program to push for local circular economy solutions

01 Oct

Australia risks losing battery plants overseas

29 Sep

Rio Tinto, Shougang Group launch industrial-scale carbon capture trial facility

28 Sep

Coal exits put Australia’s grid reliability to the test

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required