Subscribe to Newsletter
  • ACQUIRE

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Gamuda Land breaks ground on $90m eco-friendly residential project in St Kilda

19 Aug, 2024
Gamuda Land breaks ground on $90m eco-friendly residential project in St Kilda



Gamuda Land (Australia) has commenced construction on a groundbreaking $90 million sustainable living project in St Kilda, Melbourne.

The development, named Fareham, is set to become one of the greenest multi-residential buildings in the city, establishing a new benchmark for eco-conscious living.

Fareham, designed by award-winning architect BayleyWard, aims to achieve net-zero operations and a minimum 8-Star average NatHERS rating.

This is particularly significant given that only 3.77 per cent of dwellings in Victoria are rated 8-Star or higher, according to CSIRO data.

The project will be powered by an embedded network providing 100 per cent renewable energy, including rooftop solar photovoltaic panels.

The 73 residences will feature water-efficient WELS-rated fixtures and fittings, from dishwashers to taps.

To encourage environmentally friendly travel, the building will include EV charging capabilities, secure bike parks, and an onsite bicycle workshop.

Gamuda Land has partnered with Markscon, a family-owned construction firm known for its work on industry-leading Nightingale projects, to implement sustainable construction techniques.

These include:

  • Incorporating passive design principles
  • Utilising green concrete technology where possible
  • Prefabricating concrete elements offsite to reduce new material usage
  • Aiming to divert 90 per cent of all waste from landfills through careful sorting and recycling

Future residents of Fareham will enjoy:

  • Consistent internal temperatures and lower energy bills due to air-tight construction, high-performance thermally-broken windows, and high levels of insulation
  • Exceptional bay views from the 16-level building
  • Access to a communal garden on level one, a wellbeing room on level two, and a communal rooftop on level 15

Jarrod Tai, Gamuda Land General Manager, emphasised the company’s commitment to sustainable development: “In 2021, Gamuda Land unveiled the Gamuda Green Plan — a commitment to sustainable construction and development, with specific steps to reduce corporate greenhouse gases emission intensity by 30 per cent in 2025, and by 45 per cent in 2030.”

Fareham is currently under construction and is scheduled for completion in 2026. Limited residences remain available, with prices ranging from $600,000 to $4,000,000.

This project represents a significant step forward in sustainable urban development, setting a new standard for eco-friendly living in Melbourne’s multi-residential space.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

Progress 2030 Summit

Progress 2030 Summit

Melbourne Build Expo 2025

Connecting Hydrogen APAC 2025

Australia Wind Energy 2025

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
16 Jan

Fortescue begins construction on first wind project

14 Jan

Solar and wind farms spill power amid oversupply

14 Jan

Neoen advances 500 MW Wheatbelt wind project

12 Jan

First stage of Eraring battery starts commercial operations

09 Jan

Japan’s first floating offshore wind farm starts operations

19 Jan

WA unveils landmark Urban Greening Strategy

15 Jan

Cement kilns safely transform unrecyclable global waste

14 Jan

2025 marked peak Green Star sustainability in Australian buildings

19 Dec

RICS report shows AI could boost green infrastructure

17 Dec

CEFC urges investors to lead green data centres growth

20 Jan

Monash scientists develop greener battery recycling

16 Jan

Rio Tinto to supply Amazon with low-carbon copper for AI data centres

16 Jan

Prometheus reveals breakthrough process for synthetic kerosene   

14 Jan

‘Breathing batteries’ store energy and carbon

14 Jan

New project advances Iron Nitride magnet production

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required