Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

CDU campus contributes to sustainable urban development

16 Nov, 2023
CDU’s city campus stays cool under Darwin heat



The façade of Charles Darwin University’s (CDU) new city campus is completed ahead of the wet season, capping off the building’s main protection against Darwin’s tropical heat and humidity.

Standing 40 metres tall, with a combination of vertical and sloping design features, the building includes curtain wall with porcelain tiles, horizontal aluminium louvres, and various types of cladding to reflect the harsh Darwin weather, while ensuring the iconic Boab tree is not overshadowed.

The façade is primarily made of porcelain cladding, which is engineered to endure — it is non-combustible, absorbs minimal water, resists high wind loads and UV and keeps infrastructure cool by reflecting heat back into the atmosphere, which also protects surrounding outdoor spaces from the emitted heat.

Architectural and façade design elements will provide a shaded, well insulated, solar controlled, and sealed thermal envelope. Other heat mitigation techniques include sustainable landscape and heat island reduction design.

The main structure of the building is separated by an air gap from the façade, and insulation and double-glazed windows further prevent the transfer of heat between surfaces and indoors.

King said the new campus would enhance educational opportunities in Darwin and contribute to sustainable urban development.

“The Australian Government is proud to partner with the NT Government and Charles Darwin University to continue to complete the high-quality facilities for the new city campus.

“I’m delighted to see this key learning and teaching institution in Northern Australia is not only gearing up for greater educational outcomes with its new facilities but also mitigating against the harsh elements of Darwin’s tropical climate.

“Cool designs make for a cool campus in more ways than one and that means a better environment for everyone studying and working there,” said King.

CDU Vice-Chancellor Professor Scott Bowman said the environmentally sustainable design ensures the city campus will endure Darwin’s changing seasons.

“In collaboration with the CSIRO Darwin Living Lab, the Precinct has been designed to weather our seven Larrakia seasons, from our monsoonal storms of the wet season to the heat of the dry.

“Catering to Darwin’s unique climate means the campus’ intelligent design is fit-for-purpose.

With the building now sealed against the coming wet weather, works continue with services fit-out, civil and drainage works, hard landscaping, general architectural finishes, metal works and roofing works, with main construction expected to be complete in the second quarter of 2024.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

All Energy Australia

All Energy Australia

Asia‑Pacific Hydrogen Summit 2026

BEX Asia (The Built Environment Expo)

International Built Environment Week (IBEW)

International Built Environment Week (IBEW)

BEX Asia (The Built Environment Expo)

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
14 Oct

ARENA commits to Australian solar farm robot manufacturing

14 Oct

TotalEnergies and KKR expand US solar JV with $1.2B deal

14 Oct

King Island wind farm upgrade complete, extends operational life

13 Oct

Contract awarded for landmark solar system at Western Sydney Airport

13 Oct

LGI grows portfolio through two Queensland solar farm acquisitions

09 Oct

Western Australia allocates $5.1M in funding for greening projects across Perth and Peel

09 Oct

AGL partners with Bega Group for large-scale rooftop solar project

07 Oct

Solar integration sets a new benchmark at Western Sydney International Airport

06 Oct

KGBS opens green building finance repository platform

18 Sep

ARENA funds electrification trial for 1,000 Canberra homes

14 Oct

Carbonxt secures expanded US supply deal, boosting FY27 outlook

13 Oct

Japanese energy giant opens $200M Queensland green hydrogen facility

06 Oct

Tasmania launches new waste and resources recovery education program

05 Oct

Tasmania launches grants program to push for local circular economy solutions

01 Oct

Australia risks losing battery plants overseas

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required