Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Australia’s first large scale hydrogen plant to be built in Pilbara

16 Sep, 2022
hydrogen



One of the world’s largest renewable hydrogen plants is due to be built in the Pilbara, after the Australian Renewable Energy Agency (ARENA) conditionally approved $47.5 million towards ENGIE’s renewable hydrogen and ammonia project near Karratha in Western Australia.

The $87 million Yuri project includes a 10 megawatt (MW) electrolyser to produce renewable hydrogen, 18 MW solar PV system to power the electrolyser and 8 MW / 5 MWh lithium-ion battery for firming, and will supply hydrogen and electricity to Yara Pilbara Fertilisers at its neighbouring liquid ammonia facility. Once completed, the project will be Australia’s largest electrolyser, capable of producing up to 640 tonnes of renewable hydrogen per year.

The project is supported by the Australian Government with a $47.5 million grant conditionally approved through ARENA’s Renewable Hydrogen Deployment Funding Round. The project is also receiving $2 million funding from the Western Australian Government’s Renewable Hydrogen Fund as part of the WA’s Renewable Hydrogen Strategy.

The project is expected to reach financial close by the end of September. Construction will commence in October and be completed by early 2024.

ENGIE Renewables Australia Pty Ltd (ENGIE) has formed a subsidiary called Yuri to develop the project. Mitsui & Co. Ltd (Mitsui) has agreed to acquire a 28 per cent stake in the Yuri subsidiary subject to satisfaction of certain conditions under its investment agreement. ENGIE and Mitsui intend to operate the Yuri project through this joint venture company.

In 2019, ARENA supported Yara with a $995,000 grant to investigate the feasibility of a renewable hydrogen and ammonia facility in the Pilbara. Positive outcomes of that study underpin the business case for the Yuri project.

Electrolysers can utilise renewable electricity to split water into hydrogen and oxygen. The renewable hydrogen produced can be used as a feedstock for chemicals such as ammonia, combusted for heat or electricity generation, or used as a zero emissions transport fuel. Ammonia is most commonly used to produce agricultural fertilisers which is currently made using hydrogen derived from fossil fuels.

Ammonia production is a highly energy intensive process, producing about 500 million tonnes of carbon dioxide as a result, which is around 1.8 per cent of global carbon dioxide emissions, similar in scale to the aviation industry.

Yuri will be funded under ARENA’s Renewable Hydrogen Deployment Funding Round, which was announced in 2020 to support the first generation of large scale renewable hydrogen plants in Australia. Funding was made available for projects larger than 5 MW, with ARENA announcing the three successful applicants in May 2021.

ARENA is working with the other two successful applicants to progress their projects to financial close.

ARENA has previously committed over $88 million to renewable hydrogen projects spanning feasibility studies, small scale electrolyser demonstrations, gas blending trials and vehicle deployments.

ARENA CEO Darren Miller said building the first hydrogen projects at scale is an important step in Australia’s journey to become a major exporter of renewable hydrogen.

“The Yuri project is Australia’s first really substantial renewable hydrogen project, and it is one of the largest so far in the world,” Mr Miller said.

“Whether it’s for decarbonising fertiliser production, or for use as a zero emissions fuel, renewable hydrogen will be vital to reducing emissions in so called hard-to-abate sectors. It is also a huge export opportunity for Australia to provide clean energy and emissions free materials to the rest of the world. This is going to be important if we are to achieve zero net emissions in the decades ahead.

“The Yuri project is exciting because fertiliser production is a significant existing end use for hydrogen and one where we can make an immediate difference because we are replacing fossil fuels with renewable energy to make hydrogen.”

“As the largest hydrogen project of its kind so far in Australia and one of the largest in the world, this project will help us understand the opportunities and challenges for producing renewable hydrogen at scale, offering valuable insights into the technical complexities, economics and supply chain considerations for future commercial scale hydrogen electrolyser projects in Australia.”

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

7th European Conference Hydrogen & P2X 2026

7th European Conference Hydrogen & P2X 2026

World Hydrogen 2026

World Hydrogen 2026 Summit and Exhibition

Hydrogen

Hydrogen Conference

China International Hydrogen Congress and Expo (CIHC 2026)

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
11 Nov

RMIT to lead new research hub to advance renewable energy and resource recovery

10 Nov

European Energy and AirTrunk open 31 MW Mulwala solar project in NSW

06 Nov

Williamsdale BESS switches on as ACT battery program advances

05 Nov

AGL subsidiary proposes 500MW Mount Britton BESS in Queensland

05 Nov

First-of-its-kind Native Title deed signed for Badgingarra wind farm

05 Nov

Passive retrofits cut exposure to heat related health risks in housing

30 Oct

Australian steel sustainability initiative takes home international award

28 Oct

Victoria expands Solar for Apartments program to cut power bills for more residents

23 Oct

UNSW Health Translation Hub awarded highest sustainability rating

22 Oct

WA invests $670,000 to advance urban greening, protect endangered cockatoos

11 Nov

WA invests $15M to establish vanadium battery facility

09 Nov

Climate group urges COP31 hosts to deliver pathway away from fossil fuels

09 Nov

Western Australia achieves 62% recycling rate in 2024-25

06 Nov

ARENA funds Hadean Energy pilot plant for green steel manufacturing

05 Nov

Australia ready to become battery manufacturing powerhouse, CSIRO report reveals

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required