Follow us:
Subscribe to our newsletter

logo

  • Energy
  • Construction
  • Resources
  • Projects
  • Products and Services
  • Events
  • Online Magazine
  • Advertise
  • Contact
Home
  • Energy
  • Construction
  • Resources
  • Projects
  • Products
  • Events
  • Online Magazine
  • Advertise
  • Contact

Construction starts on two renewable energy projects in SA

12 Oct, 2020
26


Construction has officially commenced on two major renewable energy projects in South Australia.

Renewable energy development company, DP Energy, and Spanish energy giant, Iberdrola, are spending $500 million on a hybrid wind and solar plant at Port Augusta Renewable Energy Park in South Australia, while Singapore-based Nexif Energy has already begun the $170 million stage two expansion of its Lincoln Gap Wind Farm, also near Port Augusta.

The Port Augusta Renewable Energy Park project will consist of 210 megawatts (MW) of wind generation from 50 turbines and 110 MW of solar PV generation from 245,000 solar panels.

The Lincoln Gap Wind Farm will ultimately consist of 464MW of wind turbines.

The 126MW first stage of the project, featuring 35 turbines, achieved full commercial operation in May while the 86MW second stage will include 24 turbines. The project also includes a 10MW grid-scale battery storage. A construction timeline for a further 252MW is still being developed.

South Australia leads Australia in the uptake of wind energy and roof-top solar with renewable sources accounting for more than 70 per cent of the electricity generated in the state.

On Friday, Premier of South Australia, Steven Marshall, turned the sod on the two projects, worth a combined $670 million.

“During the construction phase of the DP Energy and Iberdrola project, there will be 200 full-time construction jobs and 20 full-time ongoing jobs once the project is complete,” Mr Marshall said.

“Nexif’s expansion will generate 110 jobs during the construction phase and 10 ongoing jobs once operational.”

“These projects provide a critical boost to South Australia’s post-COVID economic recovery, and are encouraged by the SA-NSW interconnector which provides them with new export opportunities,” he commented.

South Australian Minister for Energy and Mining Dan van Holst Pellekaan commented that the mix of wind and solar at DP and Iberdrola’s project would showcase a new generation of renewables designed to provide predictable power more uniformly across the day.

“The project’s combined solar and wind generation output is expected to closely match South Australia’s electricity demand profile which will help place downwards pressure on electricity prices while also assisting with the security and reliability of the grid,” he said.

Meanwhile, construction of the 280MW Cultana Solar at nearby Whyalla is expected to begin in the coming months.

The project, on a 1100 hectare site north of Whyalla on Eyre Peninsula, is the first large scale project in billionaire industrialist Sanjeev Gupta’s plan to generate one gigawatt of dispatchable renewable energy in South Australia.

The state is also home to the world’s largest lithium-ion battery (100MW/129MWh), which was established in late 2017 at Neoen’s Hornsdale Wind Farm in the state’s Mid-North.

Related Articles

Newcastle expertise chosen for Alice Springs Future Energy Grid

Developers sought for prospective land at Port Bonython

Hydrogen Park South Australia opens for business

More than 350,000 solar panels now installed across SA

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Latest Posts

  • Energy
  • Construction
  • Resources
24 Jun

EEC Professional Certifications to prepare Australia’s energy workforce

24 Jun

Funding to extend operations of the Australian Centre for Advanced Photovoltaics 

22 Jun

Emerging technologies like LEMs can solve Australia’s energy crisis

17 Jun

End-of-life plan needed for tens of thousands of wind turbine blades

17 Jun

Record growth in renewables but historic chance for clean energy recovery is missed, according to report

23 Jun

Cities of the future may be built with algae-grown limestone

22 Jun

Global sophisticated green building designs awarded

22 Jun

A national environmental impact standard to measure embodied carbon

15 Jun

Australian cities falling behind global cities on sustainability according to 2022 Sustainable Cities Index

14 Jun

Only timber can tackle climate change – timber and the latest construction technology

24 Jun

Farmers say food supply must come before gas export industry

23 Jun

WA to cut emissions by 80 per cent by 2030 for state utilities

21 Jun

Pathways to sustainable metal production and greening grids

20 Jun

Business leaders called on to slash Scope 3 emissions

16 Jun

Review shows positive economic outcomes in green government spending

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to our newsletter

Our Other Titles

  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2022 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required