Subscribe to Newsletter
  • ACQUIRE
  • JAPAN ENERGY SUMMIT

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

Emerald set to supercharge by joining CQ big battery blitz

23 Mar, 2023
Members of the Central Queensland Regional Community Forum at the Tanby battery. Image supplied.


Emerald has been selected for Central Queensland’s next large-scale network-connected battery site, which will provide eight megawatt-hours of energy with 4 megawatts of power for up to 2 hours.

The new battery, part of the Queensland Energy and Jobs Plan, is second in Central Queensland after Tanby switched on last year, and will be publicly owned by Ergon Energy.

The new battery is one of the next 12 large-scale, electricity network-connected batteries that will help Queensland communities reap even more benefits from rooftop solar.

Emerald is home to over 1,920 solar systems, and the battery will allow locals to capture cheap renewable energy and drive down power bills, easing the cost of living.

Member for Rockhampton Barry O’Rourke said: “The renewable energy revolution in Central Queensland is good for jobs, good for the economy, and good for the environment, and proudly led by our publicly owned transmission and distribution companies Powerlink and Ergon Energy.

“Construction work is also underway on building a brand-new 50-megawatt battery near Gracemere, which could provide enough power for nearly all the homes in Gracemere and changes the way energy supply and demand can be managed during peak times.

“It means we can pump more cheap renewables into the Queensland SuperGrid and create more good jobs in our publicly owned energy system for workers in Central Queensland.”

Related Articles

2024 World Battery & Energy Storage Industry Expo (WBE)

The Australian Energy & Battery Storage Conference

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
20 May

Snowy 2.0 workers strike over pay disparity

16 May

Long-duration batteries key to renewable reliability

16 May

Rural not-for-profits drive clean energy in regional Australia

13 May

NSW unveils 10 Central-West Orana renewables projects

13 May

Australia’s grid hits record 43 per cent renewables in 2025

13 May

ResiLoop drives Melbourne flooring waste recycling revolution

13 May

Melbourne housing growth exposes environmental crisis

08 May

NABERS SPI 2025 launches milestone

29 Apr

Salta achieves first 5-Star Green Star industrial milestone

28 Apr

GCCA launches world’s first low carbon ratings system

13 May

Queensland resources sector drives energy transition

08 May

Global energy mix shifts slowly toward fuel alternatives

08 May

Clean energy mineral rush fuels rights abuses

29 Apr

Mitsui invests $1b in US low-carbon ammonia project

24 Apr

Collie’s industrial transformation accelerates with major project milestones

  • BATTERY ASSET MANAGEMENT SUMMIT

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2025 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required