Subscribe to Newsletter

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

New POWER BEAST targets commercial storage challenges

21 Jul, 2026



Fox ESS has announced the Australian launch of POWER BEAST, a scalable commercial and industrial energy storage solution combining the H3 Plus Hybrid Inverter with the CQ7 High Voltage Storage Battery.

The new platform is designed to address a common pain point in the commercial and industrial storage market.

Traditional commercial battery systems often require extensive cabling, multiple connection points, and significant on-site assembly, adding time and cost to installation for partners and project developers.

“POWER BEAST combines a compact dual-stack design with fast, plug-and-play installation, reducing system height and installation complexity,” said Brooks Richard Geng, APAC & Middle East Managing Director at Fox ESS.

“By integrating the H3 Plus with the scalable CQ7 platform, we are helping partners lower costs, save space and deliver C&I projects with greater confidence.”

POWER BEAST is built around three core components: the H3 Plus Hybrid Inverter, the modular CQ7 High Voltage Battery, and the optional CQ7 Dual Tower Base.

The H3 Plus is available with AC output ranging from 50 kW to 125 kW and supports up to three independent battery inputs, giving installers flexibility across a range of project sizes.

When paired with CQ7 batteries, a single inverter can support up to 292 kWh of storage capacity.

For larger deployments, multiple POWER BEAST systems can be scaled up to 3.125 MW and 7.35 MWh for on-grid applications, or 1.25 MW and 2.94 MWh for off-grid applications, positioning the system as a viable option for a broad spectrum of commercial energy needs.

The launch also addresses a specific opportunity for projects in New South Wales.

For those targeting the NSW Peak Demand Reduction Scheme BESS4 capacity range, a configuration of one H3 Plus 100 kW inverter paired with two CQ7 battery stacks delivers approximately 195 kWh of storage capacity.

This configuration is designed to help projects maximise potential incentive value under the scheme.

A key feature of the new system is the CQ7 Dual Tower Base, which supports two battery stacks on a single shared base while keeping the overall system height under 1.3 metres.

The base includes pre-installed power and communication connections, which Fox ESS says simplifies installation and reduces wiring risks on site.

The system is also designed to integrate solar PV, battery storage, emergency power supply backup, generator support and EV charging, with individual modules taking approximately five seconds to install.

By combining the H3 Plus Hybrid Inverter, the modular CQ7 storage battery and the Dual Tower Base accessory, POWER BEAST gives installers, EPCs, distributors and project partners a scalable commercial and industrial platform built to reduce installation complexity and make more efficient use of available space.

The compact footprint and simplified connection design are aimed at helping partners cut down on labour time and site preparation, while the modular architecture allows systems to be tailored to specific project requirements without extensive redesign.

The launch reflects the growing demand across Australia’s commercial and industrial sector for storage solutions that can be deployed quickly and scaled as energy needs evolve.

As businesses and developers look to reduce costs, improve energy resilience and take advantage of incentive schemes such as BESS4, systems that combine flexibility with straightforward installation are becoming increasingly important to the market.

Fox ESS said the Australian rollout of POWER BEAST is part of its broader push to support partners across the APAC region with scalable, efficient energy storage technology.

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

2024 World Battery & Energy Storage Industry Expo (WBE)

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
06 Nov

Williamsdale BESS switches on as ACT battery program advances

05 Nov

AGL subsidiary proposes 500MW Mount Britton BESS in Queensland

05 Nov

First-of-its-kind Native Title deed signed for Badgingarra wind farm

02 Nov

Bushfire smoke a major risk to solar farm energy output

28 Oct

Clean energy regulator cracks down on non-compliant solar and battery operators

05 Nov

Passive retrofits cut exposure to heat related health risks in housing

30 Oct

Australian steel sustainability initiative takes home international award

28 Oct

Victoria expands Solar for Apartments program to cut power bills for more residents

23 Oct

UNSW Health Translation Hub awarded highest sustainability rating

22 Oct

WA invests $670,000 to advance urban greening, protect endangered cockatoos

06 Nov

ARENA funds Hadean Energy pilot plant for green steel manufacturing

05 Nov

Australia ready to become battery manufacturing powerhouse, CSIRO report reveals

05 Nov

Green ammonia fuel transfer in Port Hedland an Australian-first

03 Nov

TotalEnergies brings methane expertise to national oil companies

02 Nov

Renewable refinery capacity set to triple by 2030

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required