Subscribe to Newsletter
  • ACQUIRE

logo

  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact
Home
  • Home
  • Energy
  • Construction
  • Resources
  • Trending
  • Business Insight
  • Events
  • Magazine
  • Advertise
  • Contact

KAESER – Built for the future

31 Jan, 2024



KAESER Australia is proud to unveil its new 4,500 square metre facility in Dandenong South (VIC), which includes offices, warehouse and workshop. The $15 million facility features various innovations which echo KAESER’s emphasis on sustainability.

The original warehouse and office was constructed in 1989 on Zenith Road, Dandenong South in the industrial outskirts of Melbourne’s south-east. The following year, KAESER Compressors Australia was established and the fledgling subsidiary moved in.

Over time the business grew, but despite modifications and expansion works, eventually it was apparent that an entirely new facility was needed. Utilising the existing site, the challenge was to keep the business running while demolishing and rebuilding the entire premises at double the size.

KAESER Australia Managing Director, Peter Eckberg

KAESER Australia Managing Director, Peter Eckberg, said of the project, “we needed a facility that would not only serve our needs in 5 or 10 years, but in 20 or 30 years’ time. And most importantly of all, we need to always uphold KAESER’s values regarding sustainability.”

This philosophy permeates the company from product design and manufacture at the head office in Coburg, Germany, all the way “downunder” to the Australian subsidiary in Melbourne, Australia.

“KAESER products set new standards when it comes to dependability, efficiency and sustainability. Our product innovations help to reduce resource and energy consumption significantly and to save emissions and operating costs,” Mr Eckberg said.

“They also help our customers to achieve their own sustainable and environmentally responsible goals. Likewise, our building and operation here in Dandenong South is designed to be as resource-friendly as possible and ultimately, move us to carbon-neutral operations.”

After a number of COVID-related setbacks, the first sod was turned on 12 January 2021. Mr Eckberg and Mrs Rada Eckberg, KAESER Australia Company Secretary, spearheaded a multi-stage process that kept the warehouse, workshop, assembly area and office running during the two-year project.

A new warehouse and temporary office space with 98kW of solar panels was built behind the old one. For a time, there was a 1 metre gap between the tilt-slab walls of the old and new buildings, representing the passage of 32 years and a metaphor contrasting the old and new.

Once the new space was operational, the old building was demolished. Over 98% of the materials that made up the old factory were recycled and reused, including all of the concrete and steel. A new workshop and office was built in its place, thus doubling the footprint.

All was finished and the final move-in completed in March 2023. Now the 4,500 sqm building is home to 196kW of solar panels, so far creating a 90% drop in energy reliance on the grid. A large screen in the reception area gives employees and visitors real time data on the solar energy generation, earnings from the grid, as well as the amount of CO² saved.

As part of KAESER’s commitment to ensure minimum possible environmental impact and move towards carbon neutral operation, three electric vehicle charging stations have also recently been installed.

In summing up the monumental project Mr Eckberg said, “it has been two years in the construction phase, and it is an overwhelming feeling of relief and satisfaction to now use this spacious, modern facility. We are pleased to look to the future knowing that while we have increased our physical footprint and given ourselves space to grow, we have also reduced our environmental footprint at the same time.”

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

4th European Green Steel Summit 2026

Northern Tasmanian Investment Conference

Northern Tasmanian Investment Conference

Climate Action and Renewable Energy (CARE)

Climate Action and Renewable Energy (CARE)

Mobility Live

Mobility Live 2025

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
16 Jan

Fortescue begins construction on first wind project

14 Jan

Solar and wind farms spill power amid oversupply

14 Jan

Neoen advances 500 MW Wheatbelt wind project

12 Jan

First stage of Eraring battery starts commercial operations

09 Jan

Japan’s first floating offshore wind farm starts operations

19 Jan

WA unveils landmark Urban Greening Strategy

15 Jan

Cement kilns safely transform unrecyclable global waste

14 Jan

2025 marked peak Green Star sustainability in Australian buildings

19 Dec

RICS report shows AI could boost green infrastructure

17 Dec

CEFC urges investors to lead green data centres growth

20 Jan

Monash scientists develop greener battery recycling

16 Jan

Rio Tinto to supply Amazon with low-carbon copper for AI data centres

16 Jan

Prometheus reveals breakthrough process for synthetic kerosene   

14 Jan

‘Breathing batteries’ store energy and carbon

14 Jan

New project advances Iron Nitride magnet production

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required