KAESER – Built for the future

31 Jan, 2024



KAESER Australia is proud to unveil its new 4,500 square metre facility in Dandenong South (VIC), which includes offices, warehouse and workshop. The $15 million facility features various innovations which echo KAESER’s emphasis on sustainability.

The original warehouse and office was constructed in 1989 on Zenith Road, Dandenong South in the industrial outskirts of Melbourne’s south-east. The following year, KAESER Compressors Australia was established and the fledgling subsidiary moved in.

Over time the business grew, but despite modifications and expansion works, eventually it was apparent that an entirely new facility was needed. Utilising the existing site, the challenge was to keep the business running while demolishing and rebuilding the entire premises at double the size.

KAESER Australia Managing Director, Peter Eckberg

KAESER Australia Managing Director, Peter Eckberg, said of the project, “we needed a facility that would not only serve our needs in 5 or 10 years, but in 20 or 30 years’ time. And most importantly of all, we need to always uphold KAESER’s values regarding sustainability.”

This philosophy permeates the company from product design and manufacture at the head office in Coburg, Germany, all the way “downunder” to the Australian subsidiary in Melbourne, Australia.

“KAESER products set new standards when it comes to dependability, efficiency and sustainability. Our product innovations help to reduce resource and energy consumption significantly and to save emissions and operating costs,” Mr Eckberg said.

“They also help our customers to achieve their own sustainable and environmentally responsible goals. Likewise, our building and operation here in Dandenong South is designed to be as resource-friendly as possible and ultimately, move us to carbon-neutral operations.”

After a number of COVID-related setbacks, the first sod was turned on 12 January 2021. Mr Eckberg and Mrs Rada Eckberg, KAESER Australia Company Secretary, spearheaded a multi-stage process that kept the warehouse, workshop, assembly area and office running during the two-year project.

A new warehouse and temporary office space with 98kW of solar panels was built behind the old one. For a time, there was a 1 metre gap between the tilt-slab walls of the old and new buildings, representing the passage of 32 years and a metaphor contrasting the old and new.

Once the new space was operational, the old building was demolished. Over 98% of the materials that made up the old factory were recycled and reused, including all of the concrete and steel. A new workshop and office was built in its place, thus doubling the footprint.

All was finished and the final move-in completed in March 2023. Now the 4,500 sqm building is home to 196kW of solar panels, so far creating a 90% drop in energy reliance on the grid. A large screen in the reception area gives employees and visitors real time data on the solar energy generation, earnings from the grid, as well as the amount of CO² saved.

As part of KAESER’s commitment to ensure minimum possible environmental impact and move towards carbon neutral operation, three electric vehicle charging stations have also recently been installed.

In summing up the monumental project Mr Eckberg said, “it has been two years in the construction phase, and it is an overwhelming feeling of relief and satisfaction to now use this spacious, modern facility. We are pleased to look to the future knowing that while we have increased our physical footprint and given ourselves space to grow, we have also reduced our environmental footprint at the same time.”

Share this story

  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook

Related Articles

4th European Green Steel Summit 2026

Northern Tasmanian Investment Conference

Northern Tasmanian Investment Conference

Climate Action and Renewable Energy (CARE)

Climate Action and Renewable Energy (CARE)

Mobility Live

Mobility Live 2025

Comments

Leave a comment Cancel reply

You must be logged in to post a comment.

Breaking

  • Energy
  • Construction
  • Resources
13 Feb

EnergyAustralia reaches financial close for Hallett battery

13 Feb

Australia drives investment in renewable manufacturing

12 Feb

Energy Vault, Peak Energy partner to develop energy storage for AI infrastructure

12 Feb

Australia accelerates massive renewable energy rollout

11 Feb

TotalEnergies signs deal with Google to power data centres

11 Feb

Sustainable landmark rising soon on Ponsonby

11 Feb

China and Switzerland showcase sustainable architecture collaboration

09 Feb

NSW government showcases net zero home to help lower energy bills

06 Feb

Construction industry pushes for freight and carbon efficiency

04 Feb

River Capital, CEFC invest in Tiwi Islands Plantation carbon project

13 Feb

Fortescue commissions battery trains to reach net zero goals

11 Feb

University of Sydney creates green hydrogen from sunlight and liquid metal

10 Feb

Miner adds a little zest to its environmental zing

10 Feb

Australia and Japan forge graphite supply partnership

06 Feb

Australia’s mining diesel emissions keep rising

Online Magazine

    Current Cover
  • Login
  • Subscribe

Subscribe

Subscribe to Newsletter

Our Titles

  • Share on Newsletter
  • Share on LinkedIn
  • Share on Twitter
  • Share on Facebook
  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2026 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required